Week of 9/20-9/24

EKP first pole up!

Looks straight to me!

Its got to be perfect!


Can you say synthetic turf field?



Working on those soccer fields!

EKP preparing to take down old pole to replace with taller pole


West Park Road bridge
Drillin'


Drivin'

Monday, September 20, 2010

West Park Road Construction Update 9/17/10

Grounding power lines in preparation for moving



Continuing to cut down Championship Fields area


Looking back into ESP Main Entrance from WPRd

Looking left (East) from Main Entrance

Looking right (West) from Main Entrance

WPRd to existing road

Looking back @ wetland/nature area from WPRd

WPRd to Ring Rd

Tuesday, September 14, 2010

9/14/10

East KY Power brought in their pole for line relocation through ESP


Cutting down Championship Fields area

ESP Main entrance area

West Park Road towards Ring Road

From the other side of West Park Rd looking towards ESP


Still putting in more storm sewer drain pipe down in soccer parking area

Week of 9/6 - 9/13

Hi all, I meant to put up a few pics from last week on Friday. FYI, we got 2.5" of rain over the weekend out there. Great for turf, to bad we don't have any!!!


Building wetland area between creek and soccer fields


These guys lay 360' to 390' of concrete drainage pipe a day!

Still need to cut down Championship Field area


Championship Fields


Babe Ruth Baseball Fields pod


West Park Road



Area where West Park Rd. and ESP Main entrance will be...

Friday, September 3, 2010

New flags!

We got some new flags for our entrance on St Johns Rd, which will be the "back" gate once the park is open. Its been a busy week, instead of bombarding everyone with a ton of photos I thought I would just put up the one today. Some of things that happened this week: Most of the baseball fields area are basically to sub-grade, storm sewer drain lines are still going in, West Park Rd construction began, Dist. 2 Hardin County water line being put in, topsoil was moved and being re-spread on some lawn areas, championship fields area almost to grade, dirt is being moved down to soccer field area near Billy Creek, drainage detention area being established on creekside of soccer fields. I'm sure I forgot something, always a lot going on at the Sports Park!

We also received the bulk of the design drawings for the remaining construction of the park, these included field specs, building structures, etc, etc. It was 155 pages of drawings which was about 20 lbs rolled up! Along with that came two different spec books that are as thick as most Steven King novels. This should keep us all busy for a while...

Have a great Labor Day weekend!