Well so much for that cool, low humidity weather. Its slowly creeping it way back up to normal July weather for this region! That makes for great construction weather right?!
Paved main entrance and miracle field parking lot up to baseball parking entrance
Soccer field rough grade...
Irrigation installation in soccer field 2...
Field light foundation drill rig...
Future office area in HQ building, "Control Room" in foreground...
Inside maintenance shop building, standing in pump/irrigation room..
Another shot of the material storage building. One inclosed, dry storage room, two covered bins, two open bins. Chemical building and fuel tanks will be to left of bins on covered concrete pad.
Bridge abutment for soccer parking bridge...
Have a great Independence Day weekend!
No comments:
Post a Comment